GGU-AXPILE | 8.07 | - Bugfix - Franki pile table missing
| 23.04.2025 |
GGU-AXPILE | 8.06 | | 11.03.2025 |
GGU-AXPILE | 8.05 | - PDFs replaced by online manuals (call via F1 and menu).
- Bugfix - Save dialogue in classic user interface has problems with file endings and filters.
- Under ‘What's new’ link to the website for change logs.
| 13.01.2025 |
GGU-AXPILE | 8.04 | - Bugfix: Grouted ductile driven pile: Skin friction qc = 25 MN/m²
| 14.08.2024 |
GGU-AXPILE | 8.03 / 7.24 | - Bugfix: Tension pile and G governing: Rd = Gd and not Rd = Gd / gam(p).
| 22.03.2024 |
GGU-AXPILE | 8.02 | - GGU-CONNECT ready
- Grouted ductile driven pile revised.
| 06.03.2024 |
GGU-AXPILE | 8.01 / 7.23 | - Bugfix: Model factor eta(s) Closed steel tube
| 31.08.2023 |
GGU-AXPILE | 8.00 | - Ratio value (min., max.) can be entered separately for each soil.
- Grouted ductile driven pile implemented.
Beta phase: Data in the annual report 2022 are not complete.
Info: Paid major update (free of charge for licensees with subscription or update insurance under the software service agreement) | 05.07.2023 |
GGU-AXPILE | 7.22 | - Design situation 'DS-E' according to current standard now 'DS-A/DS-E'
- Design situation 'DS-E(old)' added.
| 14.03.2023 |
GGU-AXPILE | 7.21 | - Requirement for minimum pile length removed. Is not included in the current EA piles.
| 09.05.2022 |
GGU-AXPILE | 7.20 | - Bugfix: Soil properties legend for tubular driven piles with D >= 1.5 m.
| 11.03.2022 |
GGU-AXPILE | 7.19 | | 24.01.2022 |
GGU-AXPILE | 7.18 | - Bugfix: Representation R,d for tension piles and weight decisive.
| 01.12.2021 |
GGU-AXPILE | 7.17 | | 14.09.2021 |
GGU-AXPILE | 7.16 | | 07.09.2021 |
GGU-AXPILE | 7.15 | | 07.06.2021 |
GGU-AXPILE | 7.14 | | 07.05.2021 |
GGU-AXPILE | 7.13 | - Bugfix: Greek letters and "copy area"
| 06.04.2021 |
GGU-AXPILE | 7.12 | - Bugfix: Rectangular driven pile and activated check box "Adopt 2014 annual report".
| 23.02.2021 |
GGU-AXPILE | 7.11 | - Calculation for non-load-bearing soil (end resistance) can be allowed.
| 04.01.2021 |
GGU-AXPILE | 7.10 | - Product management: Tension piles
| 04.11.2020 |
GGU-AXPILE | 7.09 | - Bugfix dimension spring stiffness
| 07.10.2020 |
GGU-AXPILE | 7.08 | - Spring stiffness in output table
| 30.09.2020 |
GGU-AXPILE | 7.07 / 6.27 | - Bugfix Tension pile: Model factors implemented.
| 23.03.2020 |
GGU-AXPILE | 7.06 | | 09.03.2020 |
GGU-AXPILE | 7.05 | | 11.02.2020 |
GGU-AXPILE | 7.04 | - Surcharge factor renamed adjustment factor.
| 21.01.2020 |
GGU-AXPILE | 7.03 | - Recommendations on Piling: Alternative method for determination of the pile base resistance implemented.
| 08.11.2019 |
GGU-AXPILE | 7.02 | - Bugfix: 2014 annual report and closed steel tube
| 10.09.2019 |
GGU-AXPILE | 7.01 | | 20.02.2019 |
GGU-AXPILE | 7.00 | - 2014 EAP annual report implemented.
- PDF import implemented.
- Mini-CAD: Layer designations can be defined.
- Expandable database with soil properties for common soils.
- Screen visualisation accelerated.
Info: Paid major update (free of charge for licensees with subscription or update insurance under the software service agreement) | 14.02.2019 |
GGU-AXPILE | 6.26 | - Revision of tension pile if weight of pull-out cone is governing.
- Producrt management
| 07.02.2019 |
GGU-AXPILE | 6.25 | - Bugfix: Tension pile if weight of pull-out cone is governing
| 05.11.2018 |
GGU-AXPILE | 6.24 | | 29.10.2018 |
GGU-AXPILE | 6.23 | - Bugfix: Determination of D(eq) double steel girder section
| 25.10.2018 |
GGU-AXPILE | 6.22 | | 31.08.2017 |
GGU-AXPILE | 6.21 | | 09.02.2017 |
GGU-AXPILE | 6.19 | - Bugfix: Calculate utilisation factor for single pile
| 26.01.2017 |
GGU-AXPILE | 6.20 | - Text for absolute heights can be entered.
| 26.01.2017 |
GGU-AXPILE | 6.18 | | 27.10.2016 |
GGU-AXPILE | 6.17 | | 19.08.2016 |
GGU-AXPILE | 6.16 | - Force unit now also in kN
- product management
| 24.05.2016 |
GGU-AXPILE | 6.14 | - Abbreviations explanation below output table
| 13.05.2016 |
GGU-AXPILE | 6.13 | | 10.05.2016 |
GGU-AXPILE | 6.12 | - Menu item 'Ground level' implemented with
| 05.10.2015 |
GGU-AXPILE | 6.11 | - Bugfix: Utilisation factor: Single pile as tension pile
| 02.10.2015 |
GGU-AXPILE | 6.10 | | 27.10.2014 |
GGU-AXPILE | 6.09 | - Bugfix: Determination of R,k and R,d if R(E,k) is determined via allowable settlement.
| 29.04.2014 |
GGU-AXPILE | 6.08 | - Bugfix: F,E,k entry in resistance-settlement diagram.
| 13.12.2013 |
GGU-AXPILE | 6.07 | - Bugfix: Single pile with actions and specified allowable settlement.
| 16.10.2013 |
GGU-AXPILE | 6.06 | - Single pile: actions can be defined and the associated utilisation factor calculated.
| 20.08.2013 |
GGU-AXPILE | 6.05 | | 06.08.2013 |
GGU-AXPILE | 6.04 | - Bugfix: Model factors for 'Open steel tube and hollow box'
| 08.01.2013 |
GGU-AXPILE | 6.03 | - Program updated
- Model factors for 'steel girder section, double steel girder section and closed steel tube' adapted to Piling Recommendations (EAP), 2nd German Edition (Table 5.5).
| 12.12.2012 |
GGU-AXPILE | 6.03 | - Model factor for 'Open steel tube and hollow box' for diameters < 0.3 m can no longer become greater than '1.0'.
| 12.12.2012 |
GGU-AXPILE | 6.02 | - Model factors for 'Open steel tube and hollow box' adapted to Piling Recommendations (EAP), 2nd edition (Table 5.5).
| 18.10.2012 |
GGU-AXPILE | 6.01 | | 26.04.2012 |
GGU-AXPILE | 6.00 | - Partial safety factors to Eurocode 7
| 06.03.2012 |
GGU-AXPILE | 5.10 | - Bugfix: Single pile result legend
| 05.05.2011 |
GGU-AXPILE | 4.08 | - Bugfix: Single pile result legend
| 05.05.2011 |
GGU-AXPILE | 5.09 | - Bugfix: Open/Save dialog box in Vista and Windows 7.
| 11.02.2011 |
GGU-AXPILE | 4.07 | - Bored pile bugfix: Output of s(sg) and s(020) in legend and dialogue box for 'single pile' and large pile lengths. No impact on result.
| 25.05.2010 |
GGU-AXPILE | 5.07 | - Bored pile bugfix: Output of s(sg) and s(020) in legend and dialogue box for 'single pile' and large pile lengths. No impact on result.
| 25.05.2010 |
GGU-AXPILE | 5.06 | - EAP + partial displacement bored pile: determination of thickness of load-bearing zone below pile toe for diameters <= 0.50 m
| 07.04.2010 |
GGU-AXPILE | 4.06 | - EAP + partial displacement bored pile: determination of thickness of load-bearing zone below pile toe for diameters <= 0.50 m
| 07.04.2010 |
GGU-AXPILE | 5.04 | | 15.03.2010 |
GGU-AXPILE | 5.05 | | 15.03.2010 |
GGU-AXPILE | 5.03 | - Calculation of perimeter of 'double steel girder section'
| 02.10.2009 |
GGU-AXPILE | 4.05 | - Calculation of perimeter of 'double steel girder section'
| 02.10.2009 |
GGU-AXPILE | 5.02 | - Maximum allowable height to width ratio increased for precast driven piles.
| 30.09.2009 |
GGU-AXPILE | 5.01 | - New partial factor to DIN 1054 Corrigendum 4 (Oct 2008)
| 29.10.2008 |
GGU-AXPILE | 4.04 | - Settlement curve visualisation improved.
| 18.04.2008 |
GGU-AXPILE | 4.03 | - Input of gamma for tension piles according to EAP
| 29.01.2008 |
GGU-AXPILE | 4.02 | - The correct value is now entered into the output table with "R,d".
| 20.11.2007 |
GGU-AXPILE | 4.01 | - New standard: output table either with "R,d" or "Allow. V"
| 24.09.2007 |
GGU-AXPILE | 4.00 | - EAP and very many improvements implemented.
| 09.07.2007 |
GGU-AXPILE | 3.03 a | - Bugfix: Input of user-defined axis values for length variation.
| 31.05.2005 |
GGU-AXPILE | 3.02 a | - Automatic reduction of end resistance to 75% for belled piles possible.
| 15.02.2005 |
GGU-AXPILE | 3.02 b | - Limitation to allowable settlement now also for new standard.
| 15.02.2005 |
GGU-AXPILE | 3.02 c | - Driven pile design new tabular values (C.2) in DIN 1054 (Jan. 2005) added.
| 15.02.2005 |
GGU-AXPILE | 3.01 a | - "Soil properties" dialogue box optimised.
| 29.01.2004 |
GGU-AXPILE | 3.00 a | | 14.12.2003 |
GGU-AXPILE | 3.00 c | - Driven pile designing to Tables C.1 + C.2 in DIN 1054.
| 14.12.2003 |
GGU-AXPILE | 3.00 b | - New DIN 1054 implemented.
| 04.12.2003 |
GGU-AXPILE | 2.23 a | - For negative allowable V-values, the corresponding values in the table are marked in red.
| 09.04.2003 |
GGU-AXPILE | 2.23 b | - Save/Load in the soil properties table now with soil designation.
| 09.04.2003 |
GGU-AXPILE | 2.22 a | | 22.02.2002 |
GGU-AXPILE | 2.21 a | | 08.10.2001 |
GGU-AXPILE | 2.20 a | - Absolute heights implemented.
| 11.11.2000 |
GGU-AXPILE | 2.10 a | - Pull-out radius can be limited.
| 06.02.2000 |
GGU-AXPILE | 2.00 a | - New Mini-CAD implemented.
| 10.03.1999 |
GGU-AXPILE | 1.11 a | - "Copy area" symbol for export of graphic elements to e.g. "Word" implemented.
| 08.02.1999 |