GGU-CONSOLIDATE | 6.04 | - Bugfix: Consolidation with both types. No longer degrees of consolidation > 100.0 %.
| 10.03.2023 |
GGU-CONSOLIDATE | 6.03 | - Number of times increased to 2000.
| 11.01.2023 |
GGU-CONSOLIDATE | 6.02 | | 02.07.2019 |
GGU-CONSOLIDATE | 6.01 | - Import load increase and settlement measured values via Windows clipboard.
| 20.05.2019 |
GGU-CONSOLIDATE | 6.00 | - Expandable database with soil properties for common soils.
- Mini-CAD: Layer designations can be defined.
- PDF import implemented.
- Screen visualisation accelerated.
Info: Paid major update (free of charge for licensees with subscription or update insurance under the software service agreement) | 26.02.2019 |
GGU-CONSOLIDATE | 5.08 | - Log with PW at a given depth
| 22.06.2016 |
GGU-CONSOLIDATE | 5.06 | | 24.03.2016 |
GGU-CONSOLIDATE | 5.05 | - Bugfix: Secondary settlement
| 23.03.2016 |
GGU-CONSOLIDATE | 5.04 | - Bugfix: Secondary settlement calculation for systems without compression index
| 16.10.2013 |
GGU-CONSOLIDATE | 5.03 | - Bugfix: Numerical overflow for vertical drains
| 10.10.2012 |
GGU-CONSOLIDATE | 5.02 | | 24.04.2012 |
GGU-CONSOLIDATE | 5.01 | - Bugfix: Open/Save dialog box in Vista and Windows 7.
| 11.02.2011 |
GGU-CONSOLIDATE | 5.00 | - Secondary settlement implemented.
| 16.10.2010 |
GGU-CONSOLIDATE | 4.12 | - Mini-CAD Version 7.10: Layers can be hidden and unhidden
| 18.02.2010 |
GGU-CONSOLIDATE | 4.11 | - No. of times increased from 40 to 200
| 20.07.2009 |
GGU-CONSOLIDATE | 4.10 | - Load increase with values up to 500% possible!
| 12.06.2009 |
GGU-CONSOLIDATE | 2.42 a | - Settlement can be displayed again graphically.
| 30.11.2005 |
GGU-CONSOLIDATE | 3.00 a | - Measured values in time-settlement diagram.
| 17.09.2005 |
GGU-CONSOLIDATE | 3.00 b | - Load/Save soil properties implemented.
| 17.09.2005 |
GGU-CONSOLIDATE | 3.00 c | - Existing load curve can be repeatly copied.
| 17.09.2005 |
GGU-CONSOLIDATE | 3.00 d | - Settlement at given depth including for systems without compression index.
| 17.09.2005 |
GGU-CONSOLIDATE | 3.00 e | - Calculation possible with subsequent installation of vertical drains.
| 17.09.2005 |
GGU-CONSOLIDATE | 2.41 a | - Porewater pressure / consolidation ratio axes can be defined.
| 02.09.2004 |
GGU-CONSOLIDATE | 2.40 a | - Degree of consolidation Upw is computed separately.
| 22.04.2004 |
GGU-CONSOLIDATE | 2.32 a | - Handling of own dialogue boxes improved.
| 20.11.2003 |
GGU-CONSOLIDATE | 2.31 a | - "Porewater pressure u(t=0)" rename into "Porewater pressure u(max)"
| 10.07.2003 |
GGU-CONSOLIDATE | 2.30 a | - Number of times increased from 40 to 200.
| 27.06.2003 |
GGU-CONSOLIDATE | 2.30 b | - Number of points for load increase increased to 200.
| 27.06.2003 |
GGU-CONSOLIDATE | 2.22 a | - Calculation of consolidation degree by means of integration of porewater pressure for non-monotone load increase no longer permissible.
| 30.04.2002 |
GGU-CONSOLIDATE | 2.21 a | - Settlement at given depth now also saved with data set.
| 01.04.2002 |
GGU-CONSOLIDATE | 2.20 a | - Settlement at given depth (computed with compression index) implemented.
| 14.03.2002 |
GGU-CONSOLIDATE | 2.11 a | - Numerical precision improved, if boundary conditions are defined.
| 25.01.2002 |
GGU-CONSOLIDATE | 2.00 a | - Vertical drainage can be calculated with compression index.
| 11.11.2001 |
GGU-CONSOLIDATE | 2.00 b | - Consolidation degree can be calculated by integration of settlements.
| 11.11.2001 |
GGU-CONSOLIDATE | 2.10 a | - If load decreases the relation between reloading / initial loading = Es(w)/Es (Cc/Cs) can be considered.
| 06.11.2001 |
GGU-CONSOLIDATE | 1.71 a | - Time-settlement curve can be displayed with markers.
| 03.11.2001 |
GGU-CONSOLIDATE | 1.70 a | - Load increase no longer monotonous increase only.
| 02.11.2001 |
GGU-CONSOLIDATE | 1.60 a | - Check for negative pore ratio when using compression index.
| 28.10.2001 |
GGU-CONSOLIDATE | 1.60 b | - Pore ratio diagram implemented.
| 28.10.2001 |
GGU-CONSOLIDATE | 1.60 c | - Vertical axis of time-settlement diagram now also from top to bottom.
| 28.10.2001 |
GGU-CONSOLIDATE | 1.50 a | - Compression index can now also be determined with logarithm to base 10.
| 25.10.2001 |
GGU-CONSOLIDATE | 1.50 b | - Initial pore ratio can now be constant over the entire layer.
| 25.10.2001 |
GGU-CONSOLIDATE | 1.40 a | - Constrained modulus Es can now also be given in MN/m².
| 15.10.2001 |
GGU-CONSOLIDATE | 1.33 a | | 08.10.2001 |
GGU-CONSOLIDATE | 1.32 a | - Output of consolidation degree available in percent.
| 17.08.2001 |
GGU-CONSOLIDATE | 1.31 a | - Data for creation of times for consolidation modelling will be saved in data set.
| 14.02.2001 |
GGU-CONSOLIDATE | 1.31 b | - Foundation data for the creation of porewater pressure will.
| 14.02.2001 |
GGU-CONSOLIDATE | 1.30 a | - When modelling with compression and consolidation coefficients, the program will determine the permeability automatically from the input data.
| 08.07.2000 |
GGU-CONSOLIDATE | 1.20 a | - Porewater pressure course at given depth can now be displayed in time-settlement diagram (see menu item "Form/Time-settlement").
| 09.06.2000 |
GGU-CONSOLIDATE | 1.20 b | - Output of protocol ASCII data (menu item "Form/Protocol") and porewater pressure course of "time-settlement curve" (menu item "Form/Time-settlement").
| 09.06.2000 |
GGU-CONSOLIDATE | 1.10 a | - Linear course for sigma(0) for modelling with compression index implemented.
| 27.05.2000 |