Updates & Changes

Here is an overview of all updates and changes to our software packages. Please subscribe to our newsletter if you would like to be notified automatically about changes and bug fixes.

To the current installation routines

 

SoftwareVersion
GGU-CONSOLIDATE6.06
  • GGU-CONNECT ready integration
18.03.2024
GGU-CONSOLIDATE6.05
  • Bugfix: Possible error message 'Surcharge <= 0.0' removed.
02.11.2023
GGU-CONSOLIDATE6.04
  • Bugfix: Consolidation with both types. No longer degrees of consolidation > 100.0 %.
10.03.2023
GGU-CONSOLIDATE6.03
  • Number of times increased to 2000.
11.01.2023
GGU-CONSOLIDATE6.02
  • Product management
02.07.2019
GGU-CONSOLIDATE6.01
  • Import load increase and settlement measured values via Windows clipboard.
20.05.2019
GGU-CONSOLIDATE6.00
  • Expandable database with soil properties for common soils.
  • Mini-CAD: Layer designations can be defined.
  • PDF import implemented.
  • Screen visualisation accelerated.

Info: Paid major update (free of charge for licensees with subscription or update insurance under the software service agreement)
 

 
26.02.2019
GGU-CONSOLIDATE5.08
  • Log with PW at a given depth
 
22.06.2016
GGU-CONSOLIDATE5.06
  • product management
24.03.2016
GGU-CONSOLIDATE5.05
  • Bugfix: Secondary settlement
23.03.2016
GGU-CONSOLIDATE5.04
  • Bugfix: Secondary settlement calculation for systems without compression index
16.10.2013
GGU-CONSOLIDATE5.03
  • Bugfix: Numerical overflow for vertical drains
 
10.10.2012
GGU-CONSOLIDATE5.02
  • Product management
 
24.04.2012
GGU-CONSOLIDATE5.01
  • Bugfix: Open/Save dialog box in Vista and Windows 7.
 
11.02.2011
GGU-CONSOLIDATE5.00
  • Secondary settlement implemented.
 
16.10.2010
GGU-CONSOLIDATE4.12
  • Mini-CAD Version 7.10: Layers can be hidden and unhidden
18.02.2010
GGU-CONSOLIDATE4.11
  • No. of times increased from 40 to 200
20.07.2009
GGU-CONSOLIDATE4.10
  • Load increase with values up to 500% possible!
 
12.06.2009
GGU-CONSOLIDATE2.42 a
  • Settlement can be displayed again graphically.
 
30.11.2005
GGU-CONSOLIDATE3.00 a
  • Measured values in time-settlement diagram.
 
17.09.2005
GGU-CONSOLIDATE3.00 b
  • Load/Save soil properties implemented.
 
17.09.2005
GGU-CONSOLIDATE3.00 c
  • Existing load curve can be repeatly copied.
 
17.09.2005
GGU-CONSOLIDATE3.00 d
  • Settlement at given depth including for systems without compression index.
 
17.09.2005
GGU-CONSOLIDATE3.00 e
  • Calculation possible with subsequent installation of vertical drains.
 
17.09.2005
GGU-CONSOLIDATE2.41 a
  • Porewater pressure / consolidation ratio axes can be defined.
 
02.09.2004
GGU-CONSOLIDATE2.40 a
  • Degree of consolidation Upw is computed separately.
 
22.04.2004
GGU-CONSOLIDATE2.32 a
  • Handling of own dialogue boxes improved.
 
20.11.2003
GGU-CONSOLIDATE2.31 a
  • "Porewater pressure u(t=0)" rename into "Porewater pressure u(max)"
 
10.07.2003
GGU-CONSOLIDATE2.30 a
  • Number of times increased from 40 to 200.
 
27.06.2003
GGU-CONSOLIDATE2.30 b
  • Number of points for load increase increased to 200.
 
27.06.2003
GGU-CONSOLIDATE2.22 a
  • Calculation of consolidation degree by means of integration of porewater pressure for non-monotone load increase no longer permissible.
 
30.04.2002
GGU-CONSOLIDATE2.21 a
  • Settlement at given depth now also saved with data set.
 
01.04.2002
GGU-CONSOLIDATE2.20 a
  • Settlement at given depth (computed with compression index) implemented.
 
14.03.2002
GGU-CONSOLIDATE2.11 a
  • Numerical precision improved, if boundary conditions are defined.
 
25.01.2002
GGU-CONSOLIDATE2.00 a
  • Vertical drainage can be calculated with compression index.
 
11.11.2001
GGU-CONSOLIDATE2.00 b
  • Consolidation degree can be calculated by integration of settlements.
 
11.11.2001
GGU-CONSOLIDATE2.10 a
  • If load decreases the relation between reloading / initial loading = Es(w)/Es (Cc/Cs) can be considered.
 
06.11.2001
GGU-CONSOLIDATE1.71 a
  • Time-settlement curve can be displayed with markers.
 
03.11.2001
GGU-CONSOLIDATE1.70 a
  • Load increase no longer monotonous increase only.
 
02.11.2001
GGU-CONSOLIDATE1.60 a
  • Check for negative pore ratio when using compression index.
 
28.10.2001
GGU-CONSOLIDATE1.60 b
  • Pore ratio diagram implemented.
 
28.10.2001
GGU-CONSOLIDATE1.60 c
  • Vertical axis of time-settlement diagram now also from top to bottom.
 
28.10.2001
GGU-CONSOLIDATE1.50 a
  • Compression index can now also be determined with logarithm to base 10.
 
25.10.2001
GGU-CONSOLIDATE1.50 b
  • Initial pore ratio can now be constant over the entire layer.
 
25.10.2001
GGU-CONSOLIDATE1.40 a
  • Constrained modulus Es can now also be given in MN/m².
 
15.10.2001
GGU-CONSOLIDATE1.33 a
  • Batch print implemented.
 
08.10.2001
GGU-CONSOLIDATE1.32 a
  • Output of consolidation degree available in percent.
 
17.08.2001
GGU-CONSOLIDATE1.31 a
  • Data for creation of times for consolidation modelling will be saved in data set.
 
14.02.2001
GGU-CONSOLIDATE1.31 b
  • Foundation data for the creation of porewater pressure will.
 
14.02.2001
GGU-CONSOLIDATE1.30 a
  • When modelling with compression and consolidation coefficients, the program will determine the permeability automatically from the input data.
 
08.07.2000
GGU-CONSOLIDATE1.20 a
  • Porewater pressure course at given depth can now be displayed in time-settlement diagram (see menu item "Form/Time-settlement").
 
09.06.2000
GGU-CONSOLIDATE1.20 b
  • Output of protocol ASCII data (menu item "Form/Protocol") and porewater pressure course of "time-settlement curve" (menu item "Form/Time-settlement").
 
09.06.2000
GGU-CONSOLIDATE1.10 a
  • Linear course for sigma(0) for modelling with compression index implemented.
 
27.05.2000

Filter